PRODUCTS CENTER
Products
Junteng structural reinforcement adhesive (epoxy) is a new type of modified epoxy-type structural reinforcement anchoring adhesive, a two-component product, with high tensile strength, good compatibility with various types of substrates (concrete, brick, rock, etc.) and metal anchors, media resistance, aging resistance, etc., is widely used in structural renovation and reinforcement, equipment installation, curtain wall installation, etc., drilling and anchoring of reinforcement bars and screws.
Product Features
Modified epoxy resin, high bonding strength, corrosion resistance, acid and alkali resistance, anti-aging.
Curing at room temperature, simple construction.
Wide bonding range, can be bonded to concrete, stone, metal and so on.
No expansion and contraction after curing, no damage to the substrate.
Environmentally friendly, non-toxic, no volatile solvents.
Scope of Application
Reinforcing steel embedment and anchor bolt anchoring in various building structures.
Reinforcement of engineering buildings, anchoring of various equipment foundations, anchoring of railways, railway tracks and rail insulation anchoring.
Installation and anchoring of chemical equipment, pipelines, billboards, etc.
Anchoring of water conservancy facilities, wharves, highways, bridges and other projects.
Proportion of Glue
Ratio of A:B component = 3:1
Construction Process
Drilling: Use the impact drill to drill the anchor hole with the required diameter and depth.
Cleaning: Blow out the floating dust in the hole with compressed air, and then use brush to clean it several times.
Dosing: Firstly, stir the AB component well in the package and mix evenly according to 3:1.
Glue injection: the adjusted adhesive from the bottom of the hole gradually outward into the hole, filling amount of 2/3 of the depth of the hole, adjusted glue should be used up in the operation period, such as the ambient temperature is higher than the room temperature is appropriate to shorten the operating time, lower than the room temperature is appropriate to extend.
Anchoring: rotate the treated steel bar to implant in the hole and fix it. Remove the excess glue from the hole.
Caveat
The construction environment is ventilated and dry, and the concrete surface is clean and free of oil.
Wear gloves, masks, goggles, helmets and other protective equipment during construction.
If it accidentally gets on the skin or clothes, use industrial alcohol and a lot of water to rinse.
If inadvertently consumed or splashed into the eyes, seek medical attention immediately.
Packaging, Storage and Transport
20kg/group, (Group A 15kg, Group B 5kg.)
This product is non-toxic. Non-dangerous goods, transported as general chemical building materials.
It should not be exposed to sunlight and rain during transport. Rain. Invert and damage the package.
This product should be stored in cool (5-25 ℃). Dry warehouse, storage period of 1 2 months, more than the storage period, in the test performance after passing, can still be used.
Add WeChat


24-hour service hotline:
Address: Shandong Province, Dezhou City Economic and Technological Development Zone, Project East East Chongde 11 Road East